Complete 5 cm2 AEM Water Electrolyzer

$3,169.98 $2,399.95

A complete alkaline anion exchange membrane water electrolyzer. The unit includes corrosion resistant 5 cm2 anode and cathode flow fields, an MEA with base metal catalysts, metal gas diffusion layers, o-ring seals, and Teflon gasketing. No heaters or cabling included.

The electrolyzer is designed to be run with 1 M KOH flowing on the anode and cathode as described in Zengcai Liu et al. “The effect of membrane on an alkaline water electrolyzer” https://doi.org/10.1016/j.ijhydene.2017.10.050

Note: The electrolyzer is built when the order is received. It generally takes up to 5 business days to build and test the unit before shipment.

ProductQuantity

In stock

SKU: 68731 Category:

Description

This alkaline water electrolyzer shows record performance because it contains Sustainion® anion exchange membranes

long term effect of Sustainion Membrane in water electrolyzer

  • It operates at high currents: 1 A/cm2 at about 1.9 V at 60 °C in flowing 1 M KOH.
  • There is no need for precious metals.
  • The electrolyzer can be rapidly turned on and turned off.
  • The electrolyzer design allows one to replace PEM electrolyzers with alkaline water electrolyzers and get similar performance.

Instructions for use

Initial set up for DM Alkaline Water Electrolyzer Cell

 

  • System set up (recommended)
    Typically, the system setup uses a peristaltic pump to meter a 1M KOH solution that is split evenly to both the anode and cathode from a common solution reservoir with two separate gas disengagements (Figure 1). The total pump flowrate is about 3 mL/min. The suggested tubing used is a 1/8” OD, 1/16” ID PTFE tubing. The length of tubing after the split into the two flow streams into the two electrode compartments should be at least 8 inches (20 cm) on each side in order to reduce the amount of current leakage (or shunt current) between the anode and cathode. The exit liquid streams with gases from the two electrode compartments are separately routed to the gas disengager which allows the liquid to drop into the separate sections, so the two product gases are not mixed together. Meanwhile gas disengager also acts as a current break.
  • Fluid Connections
    The fluid inlet and outlet ports are located in the center of cell (Figure 2). Use appropriate tool to hold Luer lock connector (#8) and remove Luer lock caps (used to cover Luer lock connectors, not shown in the figure) without loosening Luer lock connector (#8). Connect PTFE tubing from pump with appropriate connectors (suggest barbed tube connector) to the Luer Lock connector at the bottom; Connect PTFE tubing from the gas disengager to the Luer lock connector at the top.
  • Power Connections
    Locate the threaded hole for wire connection on top of the cell (smaller through-hole 8-32 thread). Then connect the ring terminal with the Phillips round head screw (#9). Use this same procedure for both anode and cathode.

    water electrolyzer setup

    Figure 1. The electrolyzer setup

    Diagram of the 5 cm2 cell

    Figure 2. Diagram of the 5 cm2 cell

    Cell Testing and Operation

    Begin pumping a 1M KOH solution from bottom connection of the solution reservoir and gas disengager at a rate of 3 mL/min which is split into two flow streams, one going to inlet of the anode chamber and the other to the cathode chamber. Then begin heating the cell by turning on the temperature controller and setting the temperature to 60°C (heaters sold separately) and holding the temperature at 60°C for at least 30 min before applying current. Connect the anode electrical lead (red) and cathode lead (black) to the positive and negative connections, respectively, on the power supply with electric wires/cables (not included). Set the power supply voltage at 2.2V and slowly begin increasing the current to a setting of 5 A (1A/cm2). The cell current will reach the desired 5A in a few min or hours depending on the cell membrane and electrode conditioning. Testing can also be done with potentiostat, but the connections depend on the testing protocol

You may also like…